SUNRUN Service & Quality System

Quality & Manufacturing Standards

From early project planning to production, inspection, delivery and after-sales support, SUNRUN provides a clear factory-direct service system for expandable and modular housing projects.

20+Years of manufacturing experience
23Construction standards compared
OEMProject-specific configurations
GlobalDestination-ready project support
Integrated Project Service

Support Built Around Your Project

Every project starts with the building use, destination, climate, layout and delivery plan. Our team aligns the specification before production begins.

01

Project Consultation

Clarify application, country, quantity, climate and site conditions to establish the right project direction.

02

Configuration & Engineering

Coordinate floor plans, insulation, doors, windows, electrical systems and optional interior requirements.

03

Quality-Controlled Production

Control materials, structural details, waterproofing, electrical protection and finished appearance at the factory.

04

Delivery & After-Sales Support

Provide packaging, loading coordination, installation guidance and responsive post-delivery technical support.

Factory-Direct Workflow

A Clear Path From Brief to Delivery

A structured workflow keeps product specifications, quality expectations and delivery responsibilities visible at every stage.

STEP 01Project BriefCountry, application, quantity and target configuration.
STEP 02Solution PlanningLayout, materials, utilities and optional systems.
STEP 03Technical ConfirmationDrawings, specifications and production details.
STEP 04Production & QCManufacturing control and pre-delivery inspection.
STEP 05Delivery SupportLoading plan, installation guidance and after-sales response.
Construction Standards

Details That Protect Long-Term Project Value

A transparent comparison of SUNRUN manufacturing standards and common entry-level market practices across structure, waterproofing, finishes, utilities and installation details.

✓23 construction details presented in one clear, mobile-responsive comparison.
Process Area SUNRUN Standard Common Market Practice
01Shell Frame
Fully galvanized steel with electrostatic powder coating, reinforced lifting heads and a balanced load-bearing frame. Black steel or partially protected frames; reinforcement and corrosion-protection details are often unclear.
02Profile Density
Denser steel-member spacing provides stronger floor support, better stability and greater resistance to deformation. Reduced steel sections or wider spacing may lower cost but increase floor vibration and structural movement.
03Embedded Hinge
Recessed galvanized hinges sit flush with the floor for a smooth surface and clean finished appearance. Exposed welded hinges may protrude above the floor and leave uneven welds or finishing gaps.
04Roof Waterproofing
A 0.8 mm corrugated steel center roof supports effective drainage and reliable long-term waterproofing. Sheet-roof joints often rely on waterproof tape that can age, loosen or create leakage risks.
05Bathroom Water Pipes
Concealed bathroom water pipes save space and create a cleaner, more attractive interior. Exposed pipework is quicker to install but occupies space and reduces the finished appearance.
06Interior Decoration
Bamboo-wood fiber wall and ceiling panels create a coordinated finish and reduce secondary on-site work. Galvanized color-steel interiors provide a more basic appearance, insulation level and living comfort.
07Detail Treatment
Matching skirting boards and ceiling cornices improve sealing, protect wall edges and create a complete finish. Sealant-only gaps collect dirt more easily and may have a shorter service life.
08Cabinet
The wall behind the cabinet is fully finished, improving appearance and avoiding secondary construction. Unfinished cabinet recesses can trap dirt, create dead corners and waste usable space.
09Integrated Lifting Head
The lifting head is integrally formed for cleaner appearance, stronger continuity and fewer visible weld marks. Separately welded lifting heads leave more obvious joints and can reduce the finished appearance.
10Exterior Wall Screws
Exterior wall panels use fewer visible fasteners for a cleaner facade. Numerous exposed screws interrupt the facade and reduce visual quality.
11Lifting Ring
Integrated lifting rings accept closing-assistance straps and wind-resistant fixing ropes without damaging the facade. Straps may be screwed directly to exterior panels, leaving visible fasteners and marks.
12Level Side-Wing Floor
The side wings align with the center floor, allowing a flat foundation without stepped level changes. Different side and center levels require a stepped foundation on both sides.
13Dimensions & Interior Height
The 20 ft model provides a 5900 × 4980 mm expanded footprint, 29 m² of floor area, with improved usable space and interior comfort. Narrower or lower configurations provide less usable area and more limited interior space.
14Panel Materials
75 mm EPS exterior walls and 50 mm interior partitions are standard, with PU, rock wool and other climate-specific upgrades. Basic 50–65 mm EPS panels offer fewer insulation grades and limited climate-specific options.
15Windows
Thermal-break aluminum, uPVC, double/triple, Low-E or laminated glazing and custom sealing systems are available. Standard uPVC, aluminum or single-glass systems may leave profile, hardware and sealing grades unspecified.
16Entrance Door
Steel, aluminum, thermal-break, security and glass door systems can be matched with coordinated frames, locks and seals. Basic door options often provide limited information about cores, hardware, hinges and sealing strips.
17Sockets
Destination-standard Chinese, EU, UK, US and Australian sockets can be configured with protected circuits and factory testing. Basic socket and switch lists may omit national standards, circuit protection and test details.
18Electrical Wiring
Folding points use yellow insulating sleeves, protected routing and correctly sized separated circuits for safer long-term operation. Ordinary direct wiring with limited folding-point protection can increase abrasion, breakage, heat and voltage-drop risks.
19Bedroom Door
Bedroom doors, frames, locks, colors and opening directions are coordinated with the interior finish. Bedroom doors are often listed only as options with limited material, hardware, soundproofing and frame details.
20Side Glass Curtain Wall
Large sliding or folding glass systems support thermal-break frames, tempered, insulated, Low-E or laminated glazing. Basic single or unspecified glass systems may provide limited thermal, acoustic, sealing and hardware information.
21Flooring Materials
SPC, PVC, wood-grain, patterned aluminum and tile systems can be selected for wear, moisture and project requirements. Basic PVC or low-density SPC options may offer lower wear resistance, stability and moisture performance.
22Bottom Insulation
PU spray, EPS filling and optional graphene floor heating form an integrated insulation, moisture-control and heating system. Basic floor substrates or simple EPS filling often lack a complete bottom-insulation, moisture and heating solution.
23Bathroom Water Supply & Drainage
Drain position, floor slope, drainage speed and joint sealing are tested before shipment. Basic floor drains and PVC pipes may provide limited information on slope, sealing, odor control and pre-delivery testing.

Plan the Right Configuration Before Production

Tell us your destination, application, preferred layout and quantity. Our team will prepare a project-specific recommendation and shipping plan.

Request Project Support